The project is aimed at addressing the emergency situation resulting from the overcrowding of prisons in Italy.
CASA DI RECLUSIONE DI SAN VITTORE
OVERALL RENOVATION AND STRUCTURAL CONSOLIDATION OF SECTIONS 2 AND 4
Prison building
(Capacity: 285) – Milan, 2018

Sections 2 and 4, which are undergoing renovation and seismic upgrading, are currently unfit for use. Both sections are composed of a basement, a mezzanine and 3 floors above ground.
In particular, section 2 underwent structural consolidation through the injection of expanding resins in the foundations and through external shoring works.
The proposed solution includes the construction of a toilet for every two cells (each cell is intended to house 2 inmates) on the inside towards the corridor and a common area intended as a passageway/lounge towards the outside.
TYPE
Prison building
CLIENT
Ministero delle Infrastrutture e dei trasporti
TEAM
Tecnicaer, consorziata Mythos S.c.ar.l
SERVICES PROVIDED
Technical and economic feasibility study, Detailed and final proposals, safety coordination in the design phase
PROJECT AREA
-
YEAR
-