Contract for the updating, for the purpose of a new tender, of the final proposals already in the process of being implemented
NUOVO ISTITUTO PENITENZIARIO DI FORLÌ
Prison building
(Capacity: 230) – Forlì, 2019

The criteria used for the design choices, considering that the updating of existing final proposals was required, were aimed at confirming the design choices already made, both for the building and the systems, adapting them to the new regulations, where applicable.
In particular, the design proposal involved the adoption of a prefabricated structural system with prestressed reinforced concrete partitions and floors, new infill walls and insulation of the cold floors with rigid polyurethane foam, replacement of the solar heat collection system and increase in surface area, replacement of the thermovector fluid production system with groundwater heat pumps, and a cogeneration plant consisting of a unit in a container.
With regards to the intramoenia works, this completion project incorporates and confirms in full the choices of the original final proposals (including the modifications that had been drawn up and approved during construction).